Soil stacks replaced while residents stay in placed

Residents were able to stay in their homes while cast-iron soil and waste pipes were replaced in three separate high-rise residential towers in Birmingham. Polypipe Terrain worked with M&E contractor IDS and Birmingham City Council to devise a solutions based on plastics pipes.

Polypipe manufactured 200 m of 110 mm Terrain dB12 and 75 mm Terrain Fuze fabricated soil and waste stacks to exact specifications and delivered them to the site in Kings Norton. Sub-contractor Lovell completed installations across the 96 properties 40% faster than the average for such works.

For more information on this story, click here: July 2014, 99
Related links:
Related articles:



modbs tv logo

Mackwell launches new exit sign range

The XYVEX EXC is the latest versatile addition to Mackwell’s XYVEX emergency exit sign range. The XYVEX EXC is designed to allow complete customisation for each application, making it ideal for meticulous, architecturally designed areas.

Improved dry pocket for SpiroTrap and SpiroCombi

Spirotech has improved the dry pocket of the magnetic dirt separator in its steel SpiroTrap and SpiroCombi units, making them even easier to maintain.

Calendar