Soil stacks replaced while residents stay in placed

Residents were able to stay in their homes while cast-iron soil and waste pipes were replaced in three separate high-rise residential towers in Birmingham. Polypipe Terrain worked with M&E contractor IDS and Birmingham City Council to devise a solutions based on plastics pipes.

Polypipe manufactured 200 m of 110 mm Terrain dB12 and 75 mm Terrain Fuze fabricated soil and waste stacks to exact specifications and delivered them to the site in Kings Norton. Sub-contractor Lovell completed installations across the 96 properties 40% faster than the average for such works.

For more information on this story, click here: July 2014, 99
Related links:
Related articles:



modbs tv logo

BEMS market shows promising performance upturn

Highlighting a determination from building owners to reduce energy consumption through technology, the building energy management systems (BEMS) market saw a 1.4% quarter-on- quarter increase in Q4 2024 – according to the Building Controls Industry Association’s (BCIA) latest market report.

Construction Carbon and CIBSE collaborate to provide environmental skills training

Construction Carbon, in collaboration with CIBSE, has announced the development of the Lifecycle Carbon Assessor Practitioner Training programme.