Soil stacks replaced while residents stay in placed

Residents were able to stay in their homes while cast-iron soil and waste pipes were replaced in three separate high-rise residential towers in Birmingham. Polypipe Terrain worked with M&E contractor IDS and Birmingham City Council to devise a solutions based on plastics pipes.

Polypipe manufactured 200 m of 110 mm Terrain dB12 and 75 mm Terrain Fuze fabricated soil and waste stacks to exact specifications and delivered them to the site in Kings Norton. Sub-contractor Lovell completed installations across the 96 properties 40% faster than the average for such works.

For more information on this story, click here: July 2014, 99
Related links:
Related articles:



modbs tv logo

Yorkshire and Humber leaders set out plans to tackle skills shortages

Leaders from across Yorkshire and the Humber came together on Friday 11th September to launch ambitious plans aimed at tackling the region’s growing construction skills shortages.

Six in 10 UK businesses look to adapt operations in response to extreme heat

According to the Q2 Barclays Business Prosperity Index, six in 10 businesses surveyed (60%) have either increased investment to adapt to extreme heat (37%) or are considering doing so (23%).