Soil stacks replaced while residents stay in placed

Residents were able to stay in their homes while cast-iron soil and waste pipes were replaced in three separate high-rise residential towers in Birmingham. Polypipe Terrain worked with M&E contractor IDS and Birmingham City Council to devise a solutions based on plastics pipes.

Polypipe manufactured 200 m of 110 mm Terrain dB12 and 75 mm Terrain Fuze fabricated soil and waste stacks to exact specifications and delivered them to the site in Kings Norton. Sub-contractor Lovell completed installations across the 96 properties 40% faster than the average for such works.

For more information on this story, click here: July 2014, 99
Related links:
Related articles:



modbs tv logo

Four new appointments at BCIA

THE Building Controls Industry Association (BCIA) has appointed a new Vice-President and three new additions to its Management Committee.

Engineering services alliance welcomes retentions reporting legislation

Engineering services alliance Actuate UK has warmly welcomed the new secondary legislation which will require reporting of cash retentions held by the large construction companies under the Reporting Regulations.