Mikrofill replaces boilers at Bedford Hospital

Mikrofill, boilers

The replacement of existing CHP plant at Bedford Hospital includes boilers supplied by Mikrofill. The three Ethos boilers each have an output of 130 kW and will primarily serve the hospital’s HWS demand. They are configured to provide heat into the main system when hot-water requirements are at a minimum.

These boilers have stainless-steel heat exchanges and operate in cascade so that the total output of 390 kW can be modulated down 13 kW for precise load matching.

The scheme is fully sequenced to ensure that the LTHW boilers serve heating in preference to the existing steam-to-LTHW heat exchanges. This takes load off the central plant and improves overall system efficiency.

For more information on this story, click here: May 2016, 106
Related links:
Related articles:



modbs tv logo

Finalists announced for the 2025 Pump Industry Awards

The Pump Industry Awards has revealed its highly anticipated finalists for 2025, showcasing the very best in innovation, performance and contribution across the pump sector. The winners will be celebrated at the prestigious gala dinner on Thursday 13th March at the Hilton Hotel, St. Georges Park in Burton on Trent.

Electrical businesses brace for project delays in 2025

The latest quarterly Building Engineering Business Survey (BEBS) has revealed that close to two thirds (63%) of electrotechnical and engineering services businesses are worried about delays to projects and the impact this can have on cashflow.