Aimteq installs BEMS at BAE logistics centre

Aimteq
The Aimteq-installed control system allows for easy monitoring, measurement and management.

Aimteq has completed installation of a Schneider BMS at a new £10.8 million defence logistics centre for BAE systems. The project provides control of functions such as domestic hot water, radiant heating and the site’s cold store for carbon fibre material.

The building is 165,000 sq ft, adjacent to the company’s engineering and manufacturing facility in Lancashire. It accommodates a 150-strong workforce.

The control system will monitor, measure and optimise building performance throughout its lifecycle. The interface has been custom-branded for BAE Systems. BMS functionality at the site primarily relates to HVAC control and monitoring both in the warehouse and single-storey office area. Two panels were built by Aimteq for the offices and warehouses, using Schneider SmartX AS-P controllers and I/O modules.

Jon Farmer, energy management lead at BAE Systems, says: “I’ve been really impressed by Aimteq’s project management and communication throughout. They have bent over backwards to ensure smooth project delivery. Furthermore, they are very dedicated and have come back to the site to resolve a few very minor snags.”

For more information on this story, click here: November 2017, 82
Related links:
Related articles:



modbs tv logo

Commercial landlords face MEES compliance crunch

Two-thirds of UK commercial real estate (CRE) owners admit they are “not fully compliant” with energy efficiency regulations, according to new research from smart buildings specialist LMG. 

Recognising outstanding achievements at CIBSE Building Performance Awards 2025

The Park Plaza Westminster Bridge in London came alive on 27th February 2025 for the prestigious CIBSE Building Performance Awards.