Tyco rises to hot-water challenge in Reading

Tyco, trace heating, DHW

Substantial energy savings for providing domestic hot water for the tallest building in Reading are being achieved with the installation of Tyco Thermal Controls’ HWAT system for maintaining water temperature in single-pipe systems. Energy savings of up to 50% compared with a recirculation system are expected for the 128 m-high building, called The Blade, which provides over 10 000 m2 of office space over 14 floors.

Contractor NG Bailey opted for Raychem’s HWAT M self-regulating cable and HWAT Eco control system, which was installed by Jointing Technologies of Woking.

The system is based on heating cables attached to the distribution pipes. They have a self-regulating output to keep the water at the required temperature. There is no need for return pipes, valves or pumps.

For more information on this story, click here:  August 2011, 137
Related links:
Related articles:



modbs tv logo

Commercial landlords face MEES compliance crunch

Two-thirds of UK commercial real estate (CRE) owners admit they are “not fully compliant” with energy efficiency regulations, according to new research from smart buildings specialist LMG. 

Recognising outstanding achievements at CIBSE Building Performance Awards 2025

The Park Plaza Westminster Bridge in London came alive on 27th February 2025 for the prestigious CIBSE Building Performance Awards.